lasco-hay-crane-in-the-middle-of-the-hall-is-the-service-platformThis year, the miscanthus specialist and energy plant pioneer Phillipe Colin from France has fulfilled his dream and raised his production and processing to a completely new level. For this purpose, a new hall had to be constructed. In that new hall, the Miscanthus (energy wood) will be stored, processed and made ready for dispatch. The hall has a length of 152m and a width of about 35m. LASCO‘s Hay crane M90 is in charge for the loading. In February we put the plant into operation and we made a few photos as well as a small video of it.
The hay crane can either be operated comfortably by radio or sitting inside the fully-glazed cabin. The transverse travel can reach up to 15.5m in width and is operated with its own electric motors including frequency converters.

Video

Photos

[nggallery id=”47″]

Our last news

Hay drying in France (video attached)

Hay drying in France (video attached)

150 km in the west of Rennes, close to the French West Coast, Lasco‘s first important French Hay drying project was commissioned in June 2016. The total Hay drying surface for the Dolo family is 800 m2. A bulk drying system increases the variety of its usage, because...

read more
LASCO’s largest Cone Splitter in action

LASCO’s largest Cone Splitter in action

The reputation precedes that the LASCO cone splitter would split wood as if it were made of cardboard. The cone splitter M12 model shown here is the largest model of its series. There are In total 12 hydraulic motors working in the machine. An intelligent transmission...

read more