lasco-hay-crane-in-the-middle-of-the-hall-is-the-service-platformThis year, the miscanthus specialist and energy plant pioneer Phillipe Colin from France has fulfilled his dream and raised his production and processing to a completely new level. For this purpose, a new hall had to be constructed. In that new hall, the Miscanthus (energy wood) will be stored, processed and made ready for dispatch. The hall has a length of 152m and a width of about 35m. LASCO‘s Hay crane M90 is in charge for the loading. In February we put the plant into operation and we made a few photos as well as a small video of it.
The hay crane can either be operated comfortably by radio or sitting inside the fully-glazed cabin. The transverse travel can reach up to 15.5m in width and is operated with its own electric motors including frequency converters.

Video

Photos

[nggallery id=”47″]

Our last news

Our this year’s hay drying training

Our this year’s hay drying training

Well prepared for the upcoming grassland season, about 60 customers from 4 countries met on April 08 at this year’s LASCO Hay drying training. After a brief welcome by Sales Manager Michael Bruckmüller, the lecture started with the Chairman of the ARGE Heumilch, Karl...

read more